Stocks & Financial News
Breaking financial news 24/7 courtesy of TradingCharts.com Inc. / TFC Commodity Charts
Gold X2 Intersects 258.4m of 0.97 g/t Au and 192.0m of 0.90 g/t Au in QES Extension Drilling
Vancouver, British Columbia--(Newsfile Corp. - November 10, 2026) - Gold X2 Mining Inc. (NYSE American: AUXX) (TSXV: AUXX) (FSE: DF80) ("Gold X2" or the "Company") is pleased to announce new assay results from exploration drilling targeting the down-dip extension of the QES Zone at the Moss Gold Project in Northwest Ontario, Canada (the "Moss Gold Project").
Michael Henrichsen, CEO and Director of Gold X2, commented: "We are very encouraged by these results, which demonstrate the continuity of broad gold mineralization over approximately 200-metre drill widths with internal high-grade zones well below the current pit shell. Importantly, these results reinforce the potential to expand the open pit to depth and add meaningful ounces to our mineral resource, while also highlighting the opportunity to define additional underground resources through future drilling. We look forward to building on this momentum as we continue to demonstrate the scale and growth potential of the Moss deposit ahead of our updated mineral resource estimate in Q1 2027."
Exploration Highlights
Assay results have been received from two drillholes targeting the down-dip extension of the QES Zone, which were completed to support evaluation of open pit expansion potential. Drilled on section, one drillhole intersected gold mineralization below the current RPEEE (Reasonable Prospects for Eventual Economic Extraction) pit shell and the second intersected gold mineralization near the base of the pit shell (Figure 1). Both drill holes returned broad intervals of low-grade gold mineralization (<1 g/t Au) over core lengths up to 258m (approximately 188m true width), including higher-grade (>2 g/t Au) zones up to 33m core length (approximately 24m true width). Gold mineralization is associated with a near vertical shear zone and true widths are estimated to be 55-75% of core length. Significant intercepts received to date include:
Outside current RPEEE pit shell (expansion):
26.0m of 1.75 g/t Au from 125.0m in MQD-26-475, including
22.0m of 2.05 g/t Au including 2.4m of 10.7g/t Au, and
258.4m of 0.97 g/t Au from 603.0m, including
17.0m of 2.08 g/t Au and
32.9m of 2.00 g/t Au and
18.0m of 2.05 g/t Au
Within current RPEEE pit shell (infill):
192.0m of 0.90 g/t Au from 447.0m in MQD-26-477, including
23.1m of 2.65 g/t Au including 6.0m of 3.98 g/t Au
Figure 1: Plan view of Moss Main and QES zones with modeled shears, reported drillholes highlighted and traces of QES dip extension drilling with pending assay results.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8051/323262_cb6805f874ea190b_001full.jpg
Drilling Below QES RPEEE Pit Shell Reinforces Extension Potential
In May 2026, Gold X2 announced the intention to drill up to 63,000m of resource expansion drilling targeting extensions below and adjacent to the current RPEEE (Reasonable Prospects for Eventual Economic Extraction) pit shell. To date, approximately 19,000m have been drilled to test continuity of down-dip gold mineralization of the QES Zone, focusing within approximately 100m of the base of the RPEEE pit shell over a strike length of approximately 900m. (Figure 2)
New (Table 1) and restated previously reported assay results (Table 2) continue to suggest that the gold-bearing shear zone is continuous from the bottom of the current RPEEE pit shell through the intercepts in drillholes MQD-26-475 (258.4 m of 0.97 g/t Au), approximately 130m below the RPEEE pit shell (this news release) and MQD-25-326 (198.5m of 0.91 g/t Au, see March 3, 2026 news release), 280m below the RPEEE pit shell (Figure 1). Previously reported results in holes MQD-26-465 (157.8m of 0.90 g/t Au including 12.0 m of 2.65 g/t Au) and MQD-26-474 (173.0m of 0.89 g/t Au including 8.0m of 4.86 g/t Au; see September 10, 2026 news release) support continuity of the gold-bearing shear zone over a strike length of approximately 160m. In all drillholes, higher-grade gold mineralization (>2 g/t Au) is associated with intervals of apparent increased strain characterized by silicification and disseminated pyrite, which is consistent with the interpreted steep southeast dipping shear zones modeled at shallower depths. These gold assay results, along with the interpreted geological continuity of structures controlling gold mineralization, present a significant exploration target with the potential to define zones of higher-grade (>2 g/t) gold mineralization over true widths in excess of 10 metres below the current RPEEE pit shell.
Figure 2: Cross section through holes MQD-26-475 and MQD-25-326 with reported intersections relative to current resource block model and RPEEE pit shell.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8051/323262_cb6805f874ea190b_002full.jpg
Figure 3: Long section showing location of reported and pending drill holes relative to QES Zone and the current RPEEE pit shell.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8051/323262_cb6805f874ea190b_003full.jpg
Table 1: New Assay Results
| HOLE ID | FROM | TO | LENGTH (m) | TRUE WIDTH (m) | CUT GRADE (g/t Au) | UNCUT GRADE (g/t Au) |
| MQD-26-475 | 125.00 | 151.00 | 26.00 | 15.0 | 1.75 | 1.77 |
| including | 125.00 | 147.00 | 22.00 | 12.7 | 2.05 | 2.07 |
| including | 125.00 | 130.00 | 5.00 | 2.9 | 2.95 | 2.95 |
| and incl. | 137.35 | 139.70 | 2.35 | 1.4 | 10.7 | 10.9 |
| and | 603.00 | 861.35 | 258.35 | 187.8 | 0.97 | 0.97 |
| including | 611.00 | 628.00 | 17.00 | 11.8 | 2.08 | 2.08 |
| including | 623.00 | 627.00 | 4.00 | 2.8 | 2.65 | 2.65 |
| and including | 650.30 | 652.50 | 2.20 | 1.6 | 1.79 | 1.79 |
| and including | 687.00 | 747.00 | 60.00 | 43.4 | 1.02 | 1.02 |
| including | 695.00 | 696.80 | 1.80 | 1.3 | 11.30 | 11.30 |
| and incl. | 734.00 | 737.00 | 3.00 | 2.2 | 2.02 | 2.02 |
| and including | 755.00 | 757.00 | 2.00 | 1.5 | 1.32 | 1.32 |
| and including | 763.00 | 795.90 | 32.90 | 24.3 | 2.00 | 2.00 |
| including | 778.85 | 793.00 | 14.15 | 10.5 | 2.65 | 2.65 |
| and including | 807.00 | 825.00 | 18.00 | 13.4 | 2.05 | 2.05 |
| including | 812.00 | 814.00 | 2.00 | 1.5 | 12.0 | 12.0 |
| MQD-26-477 | 447.00 | 639.00 | 192.00 | 136.8 | 0.90 | 0.90 |
| including | 481.40 | 507.30 | 25.90 | 17.9 | 1.04 | 1.04 |
| including | 488.80 | 490.00 | 1.20 | 0.8 | 12.60 | 12.60 |
| and including | 530.25 | 535.70 | 5.45 | 3.9 | 2.36 | 2.36 |
| and including | 551.00 | 554.00 | 3.00 | 2.1 | 1.31 | 1.31 |
| and including | 557.30 | 593.00 | 35.70 | 25.8 | 1.07 | 1.07 |
| and including | 607.00 | 630.05 | 23.05 | 17.1 | 2.65 | 2.65 |
| including | 609.00 | 615.00 | 6.00 | 4.4 | 3.98 | 3.98 |
| and incl. | 628.35 | 630.05 | 1.70 | 1.25 | 14.9 | 14.9 |
| Intersections calculated above a 0.3 g/t Au cut-off with a top cut of 30 g/t Au and a maximum internal waste interval of 10 metres. Pale orange shaded intervals are intersections calculated above a 1.0 g/t Au cut-off and a maximum internal waste interval of 10 metres. Medium orange intervals are intersections calculated above a 2.0 g/t Au cut-off and a maximum internal waste interval of 3 metres. Dark orange intervals are intersections calculated above a 2.0 g/t Au cut-off and core length less than 2.0m. True widths are approximate and assume a subvertical body. | ||||||
 
Table 2: Previously Reported QES Down-Dip Intercepts
| HOLE ID | FROM | TO | LENGTH (m) | TRUE WIDTH (m) | CUT GRADE (g/t Au) | UNCUT GRADE (g/t Au) |
| MQD-25-181 | 494.00 | 594.75 | 100.75 | 73.1 | 1.50 | 1.50 |
| including | 521.00 | 569.00 | 48.00 | 34.9 | 2.34 | 2.34 |
| including | 542.00 | 544.00 | 2.00 | 1.5 | 8.72 | 8.72 |
| and incl. | 549.00 | 556.00 | 7.00 | 5.1 | 4.79 | 4.79 |
| and incl. | 565.00 | 568.00 | 3.00 | 2.2 | 5.95 | 5.95 |
| and including | 583.00 | 594.75 | 11.75 | 8.6 | 1.64 | 1.64 |
| including | 584.90 | 588.00 | 3.10 | 2.3 | 4.50 | 4.50 |
| and | 625.00 | 667.00 | 42.00 | 31.3 | 0.65 | 0.65 |
| including | 634.15 | 642.40 | 8.25 | 6.1 | 2.16 | 2.16 |
| MQD-25-326 | 167.00 | 206.00 | 39.00 | 21.1 | 0.69 | 0.69 |
| including | 193.00 | 204.00 | 11.00 | 6.0 | 1.47 | 1.47 |
| and | 345.00 | 366.00 | 21.00 | 12.0 | 0.77 | 0.77 |
| including | 348.00 | 357.00 | 9.00 | 5.1 | 1.49 | 1.49 |
| and | 759.00 | 957.45 | 198.45 | 120.0 | 0.91 | 0.91 |
| including | 821.00 | 864.00 | 43.00 | 25.9 | 1.99 | 1.99 |
| including | 826.00 | 836.00 | 10.00 | 6.0 | 4.37 | 4.37 |
| and incl. | 843.00 | 845.00 | 2.00 | 1.2 | 7.15 | 7.15 |
| including | 878.00 | 902.90 | 24.90 | 15.2 | 1.51 | 1.51 |
| including | 893.00 | 902.90 | 9.90 | 6.0 | 2.46 | 2.46 |
| and | 968.00 | 981.00 | 13.00 | 8.1 | 1.04 | 1.04 |
| including | 969.00 | 981.00 | 12.00 | 7.5 | 1.08 | 1.08 |
| and | 1022.00 | 1049.00 | 27.00 | 17.2 | 0.70 | 0.70 |
| including | 1022.00 | 1035.00 | 13.00 | 8.3 | 1.18 | 1.18 |
| including | 1033.00 | 1035.00 | 2.00 | 1.3 | 5.27 | 5.27 |
| MQD-26-465 | 637.80 | 688.80 | 51.00 | 36.2 | 0.45 | 0.45 |
| and | 707.25 | 865.00 | 157.75 | 117.0 | 0.90 | 0.90 |
| including | 751.00 | 766.60 | 15.60 | 11.4 | 1.22 | 1.22 |
| including | 751.00 | 756.00 | 5.00 | 3.7 | 2.02 | 2.02 |
| including | 774.00 | 816.00 | 42.00 | 31.3 | 1.43 | 1.43 |
| including | 790.05 | 802.00 |
|
|
Do not sell my personal information


