Stocks TradingCharts.com

stocks prices, charts & quotes

Free Stock Prices, Charts & Stock Price Quotes

Search
Symbol Search Browse Symbols My Charts Menu
QUICK QUOTE
QUICK CHART
F.A.Questions Suggestion Box Advertising Info Commodity Charts Forex Markets

Stocks & Financial News

Breaking financial news 24/7 courtesy of TradingCharts.com Inc. / TFC Commodity Charts

Mithril Silver And Gold September 2026 Quarterly Report Target 4 Emerges As The Next Potential Resource Area And Target 1 Scoping Study/Pea Commenced

Oct 28, 2026 (TheNewswire.ca via COMTEX) --

(via TheNewswire)

Mithril Silver and Gold Limited

Melbourne, Australia and Vancouver, Canada – TheNewswire - October 28, 2026 - Mithril Silver and Gold Limited ("Mithril" or the "Company") (TSXV: MSG) (ASX: MTH) (OTCQB: MTIRF) is pleased to report on its quarterly activities and cash flow for its Copalquin and La Dura properties in Durango State, Mexico for the period ended September 30, 2026.

EXPLORATION HIGHLIGHTS

  • First systematic drilling of the Copalquin-Zaragoza Structure at Target 4 returned wide, high-grade and near-surface silver-gold mineralisation, confirming mineralisation over a strike length of 550 metres and 200 metres vertically within a structure with a potential strike length of 1.5 km1: 

    • 11.70 m @ 456 g/t AgEq2 (1.06 g/t gold and 381 g/t silver) from 22.0 m (CO26-001), including 

3.40 m @ 1,239 g/t AgEq (2.72 g/t gold and 1,049 g/t silver) from 28.4 m, and including

0.60 m @ 3,877 g/t AgEq (4.81 g/t gold and 3,540 g/t silver) from 31.2 m

    • 13.95 m @ 387 g/t AgEq (1.76 g/t gold and 264 g/t silver) from 88.85 m (CO26-002), including 

1.00 m @ 1,747 g/t AgEq (7.03 g/t gold and 1,255 g/t silver) from 97.0 m

    • 6.50 m @ 320 g/t AgEq (0.22 g/t gold and 305 g/t silver) from 93.4 m (CO26-003), including 

0.50 m @ 1,890 g/t AgEq (1.07 g/t gold and 1,815 g/t silver) from 97.0 m

  • The Copalquin-Zaragoza Structure remains open, with approximately 400 m of strike to the northwest towards El Refugio (Target 1) and 600 m to the southeast towards the historic San Manuel mine. Drilling has progressed with two drills at Target 4 to expand the structural corridor (assays pending). 

  • Follow-up drilling at La Maquina (Target 5) intercepted 0.50 m @ 12.20 g/t gold and 848 g/t silver (1,702 g/t AgEq) from 168.25 m (MA26-002), extending the La Maquina high-grade discovery 150 m to the northwest. 

  • Post-resource-upgrade drilling at Target 1 intercepted 13.45 m @ 1.55 g/t gold and 16.6 g/t silver from 30.4 m (LS26-008), including 0.50 m @ 27.90 g/t gold and 156 g/t silver from 41.2 m at La Soledad, and 0.55 m @ 7.54 g/t gold, 17.4 g/t silver from 404.95 m (RE26-017) down dip at El Refugio. 

  • Target 1 Scoping Study/Preliminary Economic Assessment (PEA) commenced3, underpinned by the upgraded Mineral Resource Estimate (75% Indicated), with permitting work progressing. 

  • NI 43-101 Technical Report for the upgraded Target 1 Mineral Resource Estimate (effective date June 29, 2026) filed on SEDAR+ on August 17, 2026. 

Corporate

  • Cash balance of A$4.1M as of 30 September 2026 and Mithril remains debt free. 

  • Mexican value added tax refunds of MXN3.5M (~A$270k) were received in Mexico during the September 2026 quarter. 

  • Annual Report and Management Discussion and Analysis for the year ended 30 June 2026 released on ASX and TSXV 29 September 20264. 

  • Mithril presented at the Precious Metals Summit, Beaver Creek, Colorado (22–25 September 2026). 

Commenting on the September 2026 quarter, Managing Director and CEO John Skeet said:

"The September quarter delivered a second potential resource area at Copalquin. Our first systematic drilling of the Copalquin-Zaragoza Structure at Target 4 (adjacent to Target 1) returned wide, high-grade silver-gold intercepts and confirmed mineralisation over 550 metres of strike and 200 metres vertically, with the structure open in both directions. Applying the geological model developed at Target 1, in particular our understanding of the post-mineral dyke system, has been central to this success and we look to apply this to other key areas of this large district.

At Target 1, the upgraded resource, now 75% Indicated and constrained within underground mining shapes, provides a strong foundation for a Scoping Study/Preliminary Economic Assessment (PEA).  The PEA is the key next step in demonstrating the economic potential of a high-grade underground silver-gold development at the first target area in the Copalquin district with results for early 2027.  Permitting to further derisk the target 1 development is progressing.

Two drills have been focused on Target 4 as we complete the fully funded 25,000 m 2026 program (assays pending). La Dura, Targets 3 and 5 and Cucaracha are lined up for drilling in 2027in addition to ongoing Target 4 resource drilling, giving Mithril a strong pipeline of news flow and catalysts over the coming months."


Click Image To View Full Size

Figure 1: Copalquin mining concession area map (70km2) showing the current main target areas, Target 1 resource area and the Target 4 structure location with other potential areas of model application (in red) across the district.

PLANNED EXPLORATION ACTIVITIES – DECEMBER 2026 QUARTER

During the December 2026 quarter, Mithril plans to:

  • Complete the 25,000 m 2026 drill program in late October 2026, evaluate all results and update the extensive geologic modelling 

  • Report results from the current Target 4 drilling testing the extension of the Copalquin-Zaragoza Structure SE towards San Manuel and NW towards Target 1, build the geologic model and plan the next phase of drilling in 2027 

  • Advance the Target 1 PEA, targeted for completion in early 2027 

  • Finalise the drill plan and permitting for La Dura ahead of first drilling in early 2027 

  • Prepare the next drill phase for Targets 3 and 5 and first drilling at Cucaracha, planned for 2027 

  • Continue district mapping and sampling, and integration of the aerial magnetic and structural datasets, including El Platano, Santa Cruz and plan the northern concession area field program for early 2027 

  • Complete relogging of some early drill core and update the district geologic model 

  • Hold the Company's Annual General Meeting on 27 November 2026 

TARGET 4 – COPALQUIN-ZARAGOZA STRUCTURE

The historic Copalquin mine is located on the northwest margin of the Copalquin arroyo, above the historic San Manuel workings. Two short tunnels were driven on a 0.4 to 0.8 m wide, steeply dipping quartz vein that sits within a 15 m wide structural corridor of thinner veins. Across the ridge to the northwest, the caved Zaragoza workings appear to be developed on the same structure.5

Earlier drilling below the Copalquin workings in 2024 returned 5.66 m @ 2.58 g/t gold and 230 g/t silver from 18.5 m (CDH-152), while several holes intersected a post-mineral dyke system (Tapp) that was previously interpreted to terminate the mineralisation. In 2025, drilling at Zaragoza intercepted 0.57 m @ 6.40 g/t gold and 4,400 g/t silver from 342.4 m (MTH-ZG25-37), approximately 130 m down dip from the historic workings.

Applying the revised interpretation of the post-mineral dyke system developed at El Refugio6, three holes (CO26-001 to CO26-003, totalling 528 m) were drilled during the quarter to test the Copalquin structure along strike, at a similar elevation and across the dykes. All three holes intercepted the target structure within the host granodiorite:

  • CO26-001 – the first hole drilled on the east side of the Copalquin arroyo, a 60 m step-out from CDH-152, intercepted an 11.70 m wide (downhole) hydrothermal vein and quartz breccia zone. 

  • CO26-002 – a 120 m step-out northwest of CDH-156 and 70 m southeast of MTH-ZG25-42, designed to bridge the Copalquin and Zaragoza structures, intercepted a 13.95 m wide (downhole) mineralised hydrothermal quartz breccia. 

  • CO26-003 – a 60 m step-out southeast of CO26-001, intercepted two zones of mineralisation; the upper zone partially truncated by the dyke system and the lower zone spanning 6.50 m (downhole) of mineralised quartz breccia and stockwork. 

The program extended the known footprint of the Copalquin vein along strike at a consistent elevation of approximately 850 metres above sea level and bridged the Copalquin and Zaragoza structures. Untested ground remains along approximately 600 m of strike and 350 m up-dip to the southeast between CO26-003 and the historic San Manuel mine, and along approximately 400 m of strike with 250 m up-dip to the northwest towards El Refugio.

Anomalous base metal mineralisation, dominated by zinc and lead with less common copper, was intercepted in all three holes at generally low concentrations. This may reflect a polymetallic component at the deeper or lower-temperature levels of the broader epithermal silver-gold system. Base metals are not included in metal equivalent calculations.


Click Image To View Full Size

Figure 2: Copalquin-Zaragoza Structure plan map showing drill traces and recent drill intercepts


Click Image To View Full Size

Figure 3: Long section of the El Refugio – Copalquin-Zaragoza vein system looking northeast

TARGET 1 – POST-MRE EXTENSION AND WESTERN DRILLING

Following completion of the Target 1 Mineral Resource Estimate (MRE) drilling program in June 2026, Mithril commenced an exploration drilling campaign testing geophysical and structural targets, advancing methodically from west to east across the district.7

  • El Refugio and La Soledad – four holes were completed after the MRE cut-off date at El Refugio (2 holes, 1,038 m) and La Soledad (2 holes, 723 m). RE26-017 intercepted mineralisation in two zones down dip of the El Refugio vein, while drilling at La Soledad tested the southeast extension of the vein, returning several notable intercepts including 13.45 m @ 1.55 g/t gold and 16.6 g/t silver from 30.4 m (LS26-008). 

  • Refugio West – five holes were drilled at El Gallo (2 holes, 462 m), La Guacima (1 hole, 228 m) and El Platano (2 holes, 1,143 m) to test the western extension of the Refugio vein between the Mineral Resource area and El Gallo. The Refugio structure was intercepted; however, mineralisation contained no reportable grades. At El Platano, EP26-002 intersected the Refugio structure between 306.05 m and 311.60 m downhole as a brecciated zone with hydrothermal quartz and minor sulphides, with anomalous but non-reportable grades. 


Click Image To View Full Size

Figure 4: Target 1 plan map showing drill hole trace locations, highlight intercepts in this announcement and resource footprint area

TARGET 5 DRILLING

In the Target 5 area, drilling tested the depth and northwest extensions of El Apomal (3 holes, 865 m), Las Lianas (3 holes, 513 m) and La Maquina (1 hole, 234 m).8

  • La Maquina – MA26-002 followed up the discovery hole MA26-0019 as a 150 m step-out to the northwest and intercepted the structure approximately 100 m below surface, returning 0.50 m @ 12.20 g/t gold and 848 g/t silver from 168.25 m. 

  • El Apomal – holes intercepted quartz breccia structures at the projected depths with reportable intercepts for gold and silver. AP26-003 intersected a semi-massive sulphide zone within a northeast-trending structure, returning 6.2 m of 0.58% lead and 0.55% zinc from 200 m, including 1 m of 2.62% lead and 1.61% zinc from 205.2 m, providing insight into the broader mineralised system. 

  • Las Lianas – narrow silver-bearing intercepts including 0.65 m @ 0.48 g/t gold and 53.7 g/t silver from 74.35 m (LI26-002). 

Drill results reported during the quarter

Table 1: Significant drill results reported during the September 2026 quarter

Hole ID

From (m)

To (m)

Length (m)

Au g/t

Ag g/t

AuEq g/t

AgEq g/t

Target 1

LS26-008

30.40

43.85

13.45

1.55

16.6

1.78

125

including

41.20

41.70

0.50

27.90

156.0

30.13

2,109

LS26-008

87.35

87.85

0.50

0.85

8.2

0.97

68

LS26-009

82.20

82.80

0.60

1.29

3.2

1.33

93

LS26-009

125.30

126.80

1.50

0.91

70.3

1.92

134

RE26-017

402.00

402.60

0.60

2.63

10.1

2.77

194

RE26-017

404.95

405.50

0.55

7.54

17.4

7.79

545

Target 4 – Copalquin-Zaragoza Structure

CO26-001

22.00

33.70

11.70

1.06

381.3

6.51

456

including

23.40

24.00

0.60

2.67

456.0

9.18

643

and

28.40

31.80

3.40

2.72

1,048.9

17.70

1,239

including

28.40

29.10

0.70

7.92

1,260.0

25.92

1,814

and

31.20

31.80

0.60

4.81

3,540.0

55.38

3,877

CO26-002

88.85

102.80

13.95

1.76

263.8

5.53

387

including

88.85

99.00

10.15

2.31

347.9

7.28

510

including

97.00

99.00

2.00

5.32

778.5

16.44

1,151

including

97.00

98.00

1.00

7.03

1,255.0

24.96

1,747

CO26-003

60.20

61.75

1.55

0.63

162.0

2.95

206

and

93.40

99.90

6.50

0.22

305.0

4.57

320

including

96.00

98.85

2.85

0.41

662.4

9.87

691

including

97.00

97.50

0.50

1.07

1,815.0

27.00

1,890

Target 5

MA26-002

168.25

168.75

0.50

12.20

848.0

24.31

1,702

AP26-002

30.60

31.10

0.50

0.40

58.7

1.24

87

AP26-003

14.10

15.50

1.40

0.21

35.4

0.71

50

LI26-001

27.60

28.10

0.50

0.26

61.0

1.13

79

LI26-002

74.35

75.00

0.65

0.48

53.7

1.25

88

Downhole lengths reported; true widths not yet established. AuEq10 and AgEq as defined in the footnotes. See ASX announcement dated 27 August 2026 for full results ≥0.10 g/t AuEq and JORC Table 1.

Table 2: Drill hole collar details for holes reported during the quarter (UTM WGS84 Zone 13N)

Hole ID

Easting (m)

Northing (m)

Elevation (m)

Azimuth (°)

Dip (°)

Depth (m)

Target 1

RE26-016

288999

2824048

1191

160

-63

501

RE26-017

289066

2824050

1178

154

-72

537

LS26-008

289703

2824063

1088

200

-60

351

LS26-009

289728

2824453

1077

160

-45

372

EP26-001

288097

2824801

1105

155

-45

651

EP26-002

288025

2824144

948

165

-55

492

GA26-001

287771

2823853

945

190

-60

162

GA26-002

287968

2823975

913

180

-60

300

LG26-001

288143

2823670

984

190

-48

228

Target 4

CO26-001

290285

2823175

887

195

-52

120

CO26-002

290052

2823308

1004

220

-63

288

CO26-003

290325

2823185

902

170

-45

120

Target 5

MA26-002

288867

2822995

725

217

-45

234

LI26-001

288718

2822450

826

235

-70

219

LI26-002

288837

2822319

844

240

-45

153

LI26-003

288842

2822317

843

220

-45

141

AP26-001

287756

2822648

814

41

-60

255

AP26-002

287703

2822648

843

42

-55

300

AP26-003

287654

2822716

865

40

-55

310

Some collar locations may be from handheld GPS pending differential GPS survey.

TARGET 1 MINERAL RESOURCE AND SCOPING STUDY/PEA

The upgraded Target 1 Mineral Resource Estimate (MRE), announced on 30 June 2026 and amended on 3 July 2026, is constrained within preliminary underground mining shapes and incorporates expected mining dilution11. 75% of the total contained gold and silver is classified as Indicated (Table 3).

Building on the MRE, Mithril has commenced a Scoping Study/Preliminary Economic Assessment (PEA) for Target 1, targeted for early 2027, providing additional basis for the permitting work to continue progress. The supporting NI 43-101 Technical Report, "Technical Report – Updated Mineral Resource Estimate – Target 1, Copalquin Property, Durango Mexico", with an effective date of June 29, 2026, was filed on SEDAR+ on August 17, 2026 and is available at www.mithrilsilvergold.com.

Table 3: Upgraded Copalquin Target 1 Mineral Resource Estimate (underground mining shape constrained and diluted)

Target 1 Area

Class

Tonnes

Gold

Silver

Gold Eq.

Gold

Silver

Gold Eq.

   

(kt)

(g/t)

(g/t)

(g/t)

(koz)

(koz)

(koz)

El Refugio

Ind

2,557

3.38

73.7

4.44

278

6,061

365

 

Inf

1,217

2.17

82.1

3.35

85

3,214

131

La Soledad

Ind

834

2.43

90.2

3.72

65

2,418

100

 

Inf

219

2.54

26.1

2.92

18

184

21

Total

Ind

3,391

3.15

77.8

4.26

343

8,479

464

 

Inf

1,436

2.23

73.6

3.28

103

3,398

151

Effective date June 29, 2026.

1. Numbers may not add due to rounding. All dollar values in United States Dollars unless otherwise noted.

2. Mineral Resources were prepared in accordance with the JORC Code (2012) and the CIM Definition Standards (2014) and Estimation of Mineral Resource and Mineral Reserve Best Practice guidelines (2019). The estimate was supervised by John Sims, President of Sims Resources LLC, independent Competent Person and Qualified Person (CPG, AIPG).

3. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. Inferred Mineral Resources have a lower level of confidence than Indicated Mineral Resources.

4. Constrained and diluted Mineral Resources are based on metal prices of US$3,300/oz Au and US$50/oz Ag and metallurgical recoveries of 96% Au and 91% Ag. AuEq g/t = Au g/t + (Ag g/t x (Ag price/Au price) x (Ag recovery/Au recovery)).

5. Reported within mining shapes generated using Datamine's Mineable Shape Optimizer (MSO) for long hole open stoping, diluted to a minimum 2 m shape width with 92% mining recovery and a total operating cost of US$97/t processed ($60/t incremental mining, $25/t processing, $10/t G&A, $2/t sustaining).

6. Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing or other relevant issues. In the Company's opinion there is reasonable potential for both gold and silver to be extracted and sold.

LA DURA PROPERTY

The nearby 20 km² La Dura property, held under an exclusive four-year option to acquire 100%12, is a brownfield property with a database of mapping, sampling and drilling. The LiDAR survey13 revealed multiple historic workings, including the four-level high-grade La Dura mine, and an initial 1.5 km long, approximately 300 m wide mineralisation corridor. The aerial magnetic survey has been completed and interpreted, with key features identified for a field program. Drill planning and permitting continued during the quarter, with La Dura positioned as a ‘walk-up’ drill target for early 2027.

CORPORATE AND FINANCIAL SUMMARY

  • Cash balance of A$4.1M at September 30, 2026 and Mithril remains debt free. 

  • Mexican value added tax refunds of MXN3.5M (~A$270k) received in Mexico during the September 2026 quarter. 

  • The Company released its Annual Report and Management Discussion and Analysis for the year ended June 30, 2026 on September 29, 202614. 

  • The NI 43-101 Technical Report supporting the upgraded Target 1 MRE was filed on SEDAR+ on August 17, 2026. 

  • Mithril presented at the Precious Metals Summit in Beaver Creek, Colorado (22–25 September 2026)15. 

  • 4,258,700 unlisted securities with an exercise price of $0.30 expired unexercised on September 5, 2026. 

Capital structure

Security

Number on issue at 30 September 2026

Fully paid ordinary shares (ASX: MTH; TSXV: MSG)

187,487,758

Listed options (ASX:MTHO)

21,576,498

Unlisted options

30,100,853

As at 30 September 2026.

Exploration Expenditure

Exploration expenditure for the quarter was A$2.58M, focussed entirely on the Copalquin District and planning work for the La Dura property, both in Mexico.

Related Party Payments

In line with its obligations under ASX Listing Rule 5.3.5, Mithril Silver and Gold Limited notes that the only payments to related parties of the Company, as advised in the Appendix 5B for the period ended 30 September 2026, pertain to Director fees, employee salaries and consulting services (A$169k included in item 1 and A$12k included in item 2).

ASX Listing Rule 5.3.1, 5.3.2 and 5.3.3

Exploration activities and expenditure during the quarter are described above. There were no mining production or development activities during the quarter. Changes to tenement interests during the quarter are nil. Tenement and mining concession information is provided at the end of this report.

ASX ANNOUNCEMENTS RELEASED DURING THE SEPTEMBER 2026 QUARTER

Date

Announcement

29 September 2026

Annual Report to shareholders

29 September 2026

Management Discussion and Analysis

29 September 2026

Appendix 4G & Corporate Governance Statement

24 September 2026

Investor Presentation – Precious Metals Summit, Beaver Creek

Do not sell my personal information

Copyright © 2026. All market data is provided by Barchart Solutions. Information is provided "as is" and solely for informational purposes, not for trading purposes or advice. To see all exchange delays and terms of use, please see disclaimer.